Skip to main content

Demonstration site · Structure and framework only · Capistrano USD data pending · Not an official CUSD publication

District Facilities

District Office

Campus aerial pending — the District’s aerial imagery replaces this frame per facility.

Type
District Facilities
Built
Pending
Acreage
Pending
Buildings
Pending
FCI
Pending

By campus

Fields quoted from Attachment A 1.1.3

1.1.3.1Land Area
Pending

Total site acreage, including fields and parking.

1.1.3.2Fire Alarm
Pending

System type, coverage and certification status.

1.1.3.3Lighting Controls
Pending

Interior and exterior control type and zoning.

1.1.3.4Bell / Clock / Intercom
Pending

Master clock, bell schedule and campus communication.

1.1.3.5Intrusion System
Pending

Intrusion detection coverage and monitoring.

1.1.3.6Mechanical System
Pending

Heating and cooling equipment type, age and controls.

1.1.3.7Portables
Pending

Count, age and condition of portable classrooms.

1.1.3.9Backflow Preventers
Pending

Device locations and last certification.

1.1.3.10Hydrants
Pending

On-site hydrant count, location and flow.

1.1.3.11Onsite & Street Parking
Pending

Stall count, accessible stalls and street capacity.

By building

Fields quoted from Attachment A 1.1.4

Building1.1.4.1Age1.1.4.2Roof Type1.1.4.3Square Footage1.1.4.4Fire Sprinklers1.1.4.5Floor Surface
No building records loaded yet. Each building at this facility will appear here as a row once Attachment A 1.1.4 data is imported.

This facility’s dashboard

One Power BI report per facility, filtered to this facility only. Condition, repair cost by system and year band, deferred maintenance, utilization and — for schools — enrollment against capacity.

Power BIDistrict OfficeReport key: facility.district-office

Capistrano Unified School District